• EXCAVATE THE AREA

    Remove existing soil, grass and unwanted material to create the correct depth for your paving base. Proper excavation provides a solid foundation and helps achieve the correct finished paving level.

    MACHINE HIRE 
  • WAIKATO SOIL

    Lay geofabric over the prepared ground before adding basecourse. It helps separate the soil from the base material, improves stability and reduces basecourse mixing into the ground overtime.

    GEOFABRIC 
  • Gap 40

    ROLL OUT GRASS

    Create a strong, stable foundation for your paving with the right base course. propre base preparation help prevent movement uneven pavers.

    BASECOURSE